TERMS AND CONDITIONS
​
CLAUSES
The following clauses apply:
1. Issues Arising From Scaffolding Works
1.1. You are responsible for the making good / repair of any damage caused by the erection, alteration and / or dismantling of scaffolds on existing roofs.
1.2. Scaffolds will be tied to the structure with ‹through ties› as required by the relevant Regulations and Codes of Practice. You are responsible for obtaining permission to use such ties. You are also responsible for ensuring the necessary openings are provided and for weatherproofing the building after the ties have been fixed. Making good of any damage caused by the use of ‹through ties will be your responsibility and at your cost.
1.3. Scaffolds will be tied to the structure using drop-in expanding anchors secured in holes drilled into the fabric of the building. You are responsible for obtaining and / or giving permission for such holes to be drilled. A tie pattern for holes, drilled to a depth to suit the anchor, will be submitted to you for approval before work is commenced.
1.4. You are responsible for ensuring that the fabric of the building is suitable and strong enough to withstand the loads imposed by the use of drop-in expanding anchors.
1.5. You are responsible for making good any damage caused to the fabric of the building through the use of drop-in anchors.
1.6. You are responsible for making good any damage to the fabric of the building, however caused, during the erection, alteration or dismantling of scaffolds.
1.7. The cost of installing additional ties for reasons beyond our control will be charged as an additional item(s).
1.8. The scaffold has not been designed to support sheeting of any description. The application of sheeting will impose additional loads requiring a review of the scaffold design. Any additional costs, including design costs, associated with the addition of sheeting to the scaffold will be charged as an additional item. Our permission to install sheeting must be obtained prior to installation.
1.9. Our quotation includes for the fixing of ties once only, unless otherwise stated. The cost of taking out and re-fixing ties for any reason whatsoever will be charged as an additional item.
1.10. All reasonable care will be taken to avoid causing damage to brickwork when removing putlogs. However, any damage so caused will be at your risk and cost.
1.11. All reasonable care will be taken when transporting equipment through the building / structure. However, any damage so caused will be at your risk and cost.
​
2.Foundations
2.1. You are responsible for ensuring that the existing roof will support the dead and live loads imposed by the scaffold together with any additional loads imposed when the scaffold is in use.
2.2. All reasonable care will be taken to avoid causing damage to the roof when erecting, altering or dismantling the scaffold. However, any damage is at your risk and cost.
2.3. You are responsible for removing the existing roof tiles / finish in order to permit the scaffold to be founded at a lower level. You are responsible for any damage caused by the temporary removal of the tiles / finish and you must indemnify
us against any subsequent claim however they arise.
2.4. You are responsible for ensuring that the surface on which the scaffold is to be built can withstand the loads to be imposed without causing deflection to the scaffold structure. For the avoidance of doubt our quotation does not include for propping of any description below the level on which the scaffold is founded.
2.5. You are responsible for the provision of a suitably constructed firm and level foundation on which the scaffold is to be built. The foundation must be capable of supporting the dead and live loads imposed by the scaffold together with any loads imposed during its use. Your foundations must extend 300mmbeyond the line of the standards.
2.6. You must ensure that the base of the scaffold is clear of all debris prior to the dismantling of the scaffold and ensure that the foot of each standard is exposed to enable recovery of base and sole plates. Any base and sole plates not recovered will be charged as an additional item.
2.7. Our price includes for the provision of single sole boards only. If ground / surface conditions require the use of additional measures these will be charged as an additional item.
2.8. You are responsible for ensuring that the fabric of the building / structure, from which the scaffold is suspended, is capable of withstanding the loads imposed. For the avoidance of doubt any additional costs incurred as a result of our inability to construct the scaffold as intended will be charged as an additional item and / or we reserve the right to determine the contract and recover our costs.
2.9. You are responsible for the following:-
2.9.1. The provision of suitable lorry access to the site for the delivery and collection of equipment.
2.9.2. The provision of a suitable and sufficient foundation for the construction of the scaffold capable of supporting The required structure
2.9.3. Approval of drawings indicating the position of standards prior to commencement of erection.
2.9.4. The design, supply, fixing and final removal of all main and secondary steelwork on which scaffolds are to be constructed.
2.9.5. Final levelling and adjustment of fork heads prior to the installation of bracing and ensuring that fork heads are in full contact with bearers prior to commencement of pouring concrete.
​
3. Pavement Licences and / or Permission to Erect Scaffolds (customer responsibility)
3.1. You are responsible for obtaining any third party permission to enable the scaffolding structures to be erected either on the site or on adjacent property. Third party permission includes, but is not limited to, the application for, and obtaining
of, pavement licences in accordance with section 169 of the Highways Act 1980. Copies of written third party permission / licences must be provided to us before work is commenced.
3.2. We reserve the right to review and amend this quotation in the event that third party permissions / licences impose additional conditions and / or obligations.
3.3. You are responsible for the installation, maintenance and removal of any lighting required to comply with any permission / licence.
3.4. You are responsible for the provision and fixing of any balk timber fender, or similar, required to comply with any permission / licence.
3.5. You are responsible for obtaining permission for us to work from or over the adjacent property including making access available to us for the transportation of our equipment on to and from site.
3.6. You are required to confirm in writing, before scaffolding work commences, that all necessary approvals, permissions and licences have been obtained.
3.7. It is your responsibility to arrange with the appropriate body for the temporary closure of the public road or right of way during the erection and dismantling of the scaffold.
​
4. Pavement Licences (our responsibility)
4.1. If the Local Highway Authority requires us as the scaffolding contractor to apply for and obtain a pavement licence in accordance with section 169 of the Highways Act 1980 we will do so. However, any fees incurred by us in obtaining
the licence will be charged as an additional item. Furthermore, any additional costs to the work not included in this quotation and arising from compliance with the obligations imposed by the licence will be charged as an additional item.
4.2. You should include sufficient time in your programme for us to obtain the appropriate licences.
4.3. You are responsible for the installation, maintenance and removal of any lighting required to comply with any permission / licence.
4.4. You are responsible for the provision and fixing of any balk timber fender, or similar, required to comply with any permission / licence.
4.5. Any fees incurred by us in obtaining the necessary pavement licences will be added to the contract sum.
​
5. Customer Obligations and Liabilities
5.1. Scaffold boards, as specified in the quotation, will be placed once only. Thereafter any movement of boards will be at your risk and expense. You will indemnify us as regards death or injury to any person and / or damage to any property arising from your movement of boards.
5.2. Scaffold boards, as specified in the quotation will be placed once only. Thereafter any movement of boards will be at your risk and expense and will be charged as an additional item.
5.3. You are responsible for the security of our scaffolding equipment at all times, whether erected or not, and you are required to indemnify us from all losses.
5.4. You are required to take all necessary steps to prevent unauthorised access on to the scaffolds at any time.
5.5. You are required to provide a firm and suitable foundation on which our scaffold can be erected. The foundation must be designed and constructed to support, without settlement or deflection, the loads imposed by our equipment together with any superimposed loads.
5.6. You are required to provide us with sufficient and suitable secure storage for our equipment within a reasonable distance of the work face.
5.7. You are responsible for providing us with an accurate datum and lines for setting out our scaffolds and you are responsible for checking the accuracy of our setting out.
5.8. You are responsible for removing all aerials, satellite dishes and similar items before we commence work.
5.9. You and / or the user of the scaffolds are responsible for carrying out statutory inspections and maintaining reports in accordance with Regulation 29 of the Construction (Health. Safety and Welfare) Regulations 1996 and / or the Working at Height Regulations 2005.
​
6. Safety Issues
6.1. The protection fan is provided for protective purposes only. It is not an access scaffold and should not be used for storage. It is your responsibility to ensure that all businesses and their personnel are informed of these conditions.
6.2. We require written notification that power cables adjacent to our works are rendered harmless prior to erection and / or dismantling of the scaffolds.
6.3. An approved handing over certificate will be issued when requested.
6.4. Scaffolds handed over to you will be tied to the structure in accordance with the statutory regulations. Ties should not be removed without our permission and / or approval and should be removed by or under the supervision of a competent person.
6.5. The scaffold has not been designed to support a rubbish chute. If you intend to erect and use a rubbish chute the scaffold will require the installation of additional ties which will be charged as an additional item.
6.6. The scaffold has not been designed to support sheeting of any description. The application of sheeting will impose additional loads requiring a review of the scaffold design. Any additional costs, including design costs, associated with the addition of sheeting to the scaffold will be charged as an additional item. Our permission to install sheeting must be obtained prior to installation.
6.7. You are responsible for ensuring that all vehicles and other obstructions are removed from the working and surrounding area before work commences. The cost of any delay in commencing work will be charged on a time and materials basis.
6.8. Scaffolds have been designed to accommodate the loads indicated in the quotation. It is your responsibility to ensure that the scaffolds are not overloaded and that any material is stacked safely and securely on the scaffold.
6.9. The scaffold has not been designed to receive heavy point loads such as large quantities of palleted materials. Such loads must be distributed along the scaffold from specially designed and constructed loading bays to ensure that the loading of the scaffold remains within its design parameter.
6.10. The scaffold has been designed to accommodate a specified number of working lifts at specified levels. Working lifts will be fully boarded with the appropriate board supports, guard-rails and toe-boards. Scaffold boards must not be moved to other non-working lifts even if guard rails are left in by scaffolders during the course of erecting the scaffold.
6.11. You are responsible for securing boards used in any working platform constructed by you using our equipment where the location / potential environment requires them to be so secured.
6.12. This quotation is provided on the understanding that you, or the users of the scaffold, are licence holders as defined by the Asbestos (Licensing) Regulations 1983. Our quotation is based on the following:-
6.12.1. You are to provide, free of charge for our use, all necessary protective clothing, respirators, changing and showering facilities as required by the Regulations.
6.12.2. Medical expenses incurred on behalf of our operatives in compliance with the Regulations will be charged as an additional item.
6.12.3. You are to supply and fix to our scaffold boards, prior to the removal of any asbestos, polythene sheeting covered with hardboard. On completion of asbestos removal you are responsible for removing the sheeting and hardboard and destruction / dumping in an approved site of any contaminated boards. Contaminated boards will
be charged at cost price plus 10%.
6.12.4. You are to certify, in writing, that all of our equipment is free of asbestos contamination before dismantling is commenced.
6.12.5. Our price includes the cost of operatives working in protective clothing and wearing respirators / face masks.
6.12.6. Our price does not include for all tube ends to be sealed with a plastic cap.
6.13. You are required to provide forced ventilation, free of charge, to enable our employees to work in clean air.
​
7. Attendances
7.1. Our quotation is based on the details and measurements provided by you. Our quotation is therefore subject to a site inspection and confirmation of the measurements supplied by you. For the avoidance of doubt this quotation is not
capable of acceptance until an inspection of the site is carried out. We have assumed good access to and from the work face is available.
7.2. You are required to cut all holes in the fabric of the building, free of charge, which may be necessary for us to erect the scaffold. You are responsible for the making good of all holes on completion of dismantling of the scaffolds.
7.3. You are responsible for providing sufficient safe and secure storage areas for our equipment that are located within a reasonable distance of the work face.
7.4. You are responsible for the accuracy of the information and measurements upon which this quotation is based. Any errors or deviations from the information may result in additional costs which will be charged as an additional item.
7.5. You are responsible for setting out the position of standards in lift shaft scaffolds to ensure that they are compatible for all trades who will be using the scaffold.
7.6. You are responsible for the provision of full on-site welfare facilities free of charge.
7.7. You are responsible for providing, free of charge at the work face, a 110-volt electrical supply.
7.8. You are responsible for supplying, fixing, maintaining and finally removing temporary task lighting at the work face.
7.9. You are responsible for removing all materials, equipment and debris from the boarded lifts before they are dismantled / moved to a new position, or finally removed from the site.
8. Before our employees are required to handle any erected equipment you are responsible for cleaning it, and / or removing debris from it, and/or decontaminating it before being removed from the site.
9. Our price is based on the understanding that we will have free use of the client›s crane, hoist, forklift and dumper at all reasonable times during normal working hours together with drivers and banksmen.
10. You are responsible for providing a firm level hardstanding, adjacent to the building, upon which and from which equipment can be pre-fabricated into sections for hoisting by mobile crane, to be provided by us, and for removal of the hardstanding on completion.
11. You are responsible for the provision of additional personnel to act as ‹lookouts› and perform other safety related duties in accordance with the site safety system.
12. You are responsible for providing sufficient and suitable mechanical access equipment to enable us to complete our work in accordance with an agreed programme. You are further responsible for providing appropriately qualified operators and suitably prepared ground conditions for the proposed equipment.
13. You are responsible for providing sufficient and suitable mechanical access equipment to enable us to complete our work in accordance with an agreed programme. You are further responsible for providing suitable ground conditions for the proposed equipment.
14. You are responsible for obtaining, issuing and explaining the contents of any ‹permits to work› required by your site safety system. Delays in issuing permits will be charged for at day work rates.
15. Financial Issues
15.1. Our offer is made on the basis that interim applications for payment will be paid in full.
15.2. The contract hire period(s) for each of the items included in this quotation represent the minimum periods of hire to be paid by you. Allowance will not be made for periods of hire less than the minimum periods or for periods when the scaffold is not in use for whatever reason. For the avoidance of doubt allowance will not be made for holidays.
15.3. Allowances will not be made to the period of hire, whether contract hire periods or periods of extra hire, for holidays or any period when scaffolds are not in use.
15.4. Work carried out on a day work basis is not subject to discount.
15.5. Payment terms are strictly 30 days from date of invoice, any overdue payments will be subject to interest at 8% calculated daily
15.5.1. The quantity of work erected will be assessed as a percentage of the total amount of each item to be erected.
15.5.2. The value of work erected will be invoiced at 75% of the agreed quotation the balance of 25% on dismantle of scaffold
15.6. Our quotation is based on the work being carried out during normal working hours. The cost of carrying out work during periods other than normal working hours will be charged as an extra to the contract.
15.7. This quotation is based on the taxes and duties payable at the date of this quotation. Any additional costs arising from a change in the taxes and duties payable will be charged as an extra to the contract.
15.8. Contra charges of any description must be notified to us in writing within 7 days of their occurrence. Such notification is a condition precedent to the Clients› entitlement to make such deductions.
15.9. Minor adaptations and minor alterations will be charged at the agreed daywork or measured rate
15.10. Additional work of a similar nature to that included in the contract work will be charged at similar rates. Work not of a similar nature will be charged at agreed rates or day work rates.
15.11. Our quotation excludes the cost of preparing engineering drawings and calculations which will be charged as an extra to the contract.
15.12. Our quotation is based on statutory regulations and work practices current at the date of this quotation. Any changes to statutory regulations and work practices giving rise to additional costs will be charged as an extra to the contract.
15.12.1. You are responsible for the safe keeping and security of all scaffolding equipment delivered to site until finally removed by us. Any material not returned to us, for whatever reason will be charged for at its replacement value.
​
16. Programme Issues
16.1. You are required to provide a minimum of 8 hours work per gang on each and every visit to site.
16.2. A Contract Programme for the scaffolding work must be agreed before work commences. The Programme must take into consideration the access available for carrying out the scaffolding works, the time required to complete the scaffolding works and the integration of the scaffolding works with another sub-contract works.
16.3. Variations to the Contract Programme must be agreed by your representative and our visiting supervisor. You must confirm programme variations to us within two working days.
16.4. The Contract Programme must be automatically extended by the number of days affected by the occurrence of inclement weather.
16.5. A minimum written notice period of seven days is required for the commencement of the works or for each separate visit following a break of more than three working days.
16.6. The hire periods of each item of scaffolding identified in our quotation is a minimum period. A rebate will not be given in the event that the period is reduced for whatever reason.
16.7. Additional costs arising from agreed changes to the Contract Programme will be added to the contract sum.
16.8. Agreement to any programmes forming part of this contract must be made, in writing, before incorporation into the contract.
16.9. The Sub-contract period is deemed to be the hire period of the main scaffolding.
16.10. Additional hire charges will commence after the expiry of the hire period for each item of scaffolding. For the avoidance of doubt the granting of extensions of time will not defer the commencement of additional hire charges.
16.11. The maximum number of plots in progress at any one time, is to be agreed before the project commences
​
17. Specification lssues
17.1. Our price(s) and / or design(s) are based on the information / specification provided by you at tender stage.
We reserve the right to amend our price(s) and / or design(s) in the event of changes to your information / specification.
17.2. Our price(s) are based on the details supplied by you. You are responsible for checking that your requirements have been correctly interpreted and that all loadings, dimensions and details are correct and practicable.
17.3. You are responsible for preparing a foundation upon which scaffolds can be constructed and for ensuring that the foundation is capable of withstanding the dead and live loads to be imposed.
17.4. In the absence of your Health and Safety Plan and I or details of any hazards that might affect our works any additional costs incurred by us as a result of these failures will be charged as additional items.
17.5. Our price(s) is based on details provided by you and is subject to confirmation following a site visit. For the avoidance of doubt our price(s) is not capable of acceptance until confirmed by us.
17.6. Our price(s) includes for the provision of inside guard-rails and toe-boards to meet the current regulations.
17.7. You are responsible for the provision of suitably surfaced site roads to enable equipment to be delivered, by lorry to within 10 meters of the work face or removed from site. The cost associated with carrying equipment greater distances will be charged as an extra.
17.8. You are responsible for providing reasonable access, at ground level, to and from the vessel / interior of the structure.
17.9. You are responsible for providing and maintaining adequate access around the structure during erection and dismantling operations.
17.10. Unless otherwise stated this quotation includes for the supply of 100% materials. For the avoidance of doubt we have not allowed for the dismantling and re-erection of the same material anywhere on the site.
17.11. Hire periods include holidays. For the avoidance of doubt hire periods and / or extra hire periods will not be reduced during holiday periods.
17.12. You are responsible for lighting the works, including task lighting.
17.13. Gantry prices are based on the information supplied by you and for the provision of a suitable foundation capable of carrying the dead and imposed loads, free of charge. You are advised to check the specification, and assumed loadings on which the price is based. Small changes to the loadings may have a significant impact on the price. Gantry works will not be commenced until a detailed specification and price is agreed.
17.14. The price of birdcage scaffolds includes for erection and dismantling operations to be carried out in compliance with current regulations and good safety practices. For the avoidance of doubt, we have included for boarded access, complete with guard-rails and the use of harnesses during erection and dismantling operations.
​
18. Miscellaneous Issues / Qualifications
18.1. Our price(s) are based on your enquiry / specification but are subject to confirmation of a number of issues before being capable of acceptance.
18.2. A full day’s work should be made available for our employees on each and every visit. We reserve the right to charge any lost time at day-work rates.
18.3. Our price(s) are based on the work being carried out during normal working hours. If work, for whatever reason is required to be carried out at other times the additional cost will be charged as an extra item.
18.4. Our price(s) includes for continuous working and does not allow for disruption outside of our control for any reason whatsoever.
18.5. Our price(s) assume that good and uninterrupted access and egress from the works will be maintained at all times during erection and dismantling operations.
18.6. Your attention is specifically drawn to the exclusions relating to work carried out on existing roof surfaces.
18.7. Our price(s) do not include for the provision and maintenance of lightning and earthing conductors of any kind or description.
18.8. Our price(s) include for erection and dismantling operations to be carried out from mechanical access equipment. You are responsible for providing, maintaining and removing suitable site roads upon which access equipment can operate.